Example WWTP Projects
|
| |
|
 |
| |
Customer: Benderson Development
Project: 1.5 Million Gallon Elevated Water Storage Tank
WPE was contracted by
Benderson Development to design a complete Water Booster
Station to provide water supply distribution to a large
commercial subdivision located in Central Massachusetts.
The project included the design of a multi-pump water
booster skid, flow level and control and town SCADA
interface. WPE was also responsible for the design of
all MEP systems associated with the facility located
within the base structure of the storage tank.
|
| |
|
 |
| |
Customer: Benderson Development
Project: Water Distribution Pressure Loss Computer Model
WPE was contracted by
Benderson Development to analyze and size the complete
water supply distribution for a large commercial
subdivision located in central Massachusetts. The design
included development of a complete computer model of the
proposed system with a water demand table associated
with all identified user loads. |
| |
| <<
back |
|
|
 |
145
Batchelder Road
Seabrook, NH 03874
603-474-7477
|
 |
|